Work Breakdown Structure In Project Management With Soft Logics
Author(s):
Akhila.BV, Sujithra.G
Keywords:
WBS – Work Breakdown Structure LOB - Line Of Balance
Abstract
This paper presents a Work Breakdown Structure (WBS) based model for repetitive projects when considering soft logic. Previous researches are based on the assumption that work sequence cannot be changed for different work zones. In reality, work sequence between work zones are not fixed (actually, constantly adjusted) throughout the project. Instead, they are often changed to shorten the construction time and minimize the total cost. Scheduling with the non- fixed work sequences between work zones is known as the soft logic method. Considering the soft logic in repetitive projects, the proposed WBS model aims to assist the project team to find the minimum overall cost subjecting to different output rates and logical sequences. The software used in this work is Oracle Primavera P6. Unlike same scheduling software programs that are somewhat of a bottom up approach, Primavera P6 encourages to create a WBS at the beginning of the project.
Article Details
Unique Paper ID: 163026

Publication Volume & Issue: Volume 0, Issue no

Page(s): 380 - 384
Article Preview & Download


Share This Article

Join our RMS

Conference Alert

NCSEM 2024

National Conference on Sustainable Engineering and Management - 2024

Last Date: 15th March 2024

Latest Publication

Call For Paper

Volume 10 Issue 10

Last Date for paper submitting for March Issue is 25 June 2024

About Us

IJIRT.org enables door in research by providing high quality research articles in open access market.

Send us any query related to your research on editor@ijirt.org

Social Media

Google Verified Reviews